Saudi Aramco
Energy / Industrial
Challenge
Significant facility-wide water consumption across staff amenities, washrooms, and catering operations — with rising sustainability reporting requirements.
Solution Deployed
Bubble90 installed across multiple facility points-of-use. No infrastructure modification required.
87%
Water saved
0 kW
Energy added
< 1yr
Payback period
Red Sea Global
Giga-Project
Challenge
Strict sustainability mandates requiring near-zero operational water waste across resort facilities in a remote coastal environment.
Solution Deployed
Bubble90 deployed at point-of-use across hospitality and operational buildings. Certified performance tracking integrated.
85%
Water reduction
0%
Pressure loss
Full
Sustainability compliance
International Hotel Group
Hospitality
Challenge
High water bills and increasing ESG audit pressure from international ownership — without ability to disrupt guest experience.
Solution Deployed
Bubble90 installed in guest room showers, kitchen pre-rinse stations, and laundry areas. Installation completed without guest disruption.
82%
Water savings
0 days
Service interruption
9 months
ROI achieved

Commission a Baseline Assessment

Green Edge conducts a no-obligation consumption baseline assessment before any pilot commitment. Results are benchmarked against comparable sector deployments.

Request a Pilot Project